Concrete Paving Train

Fedharmony recently partnered with HEM Paving in Grundy Center Iowa to provide the Air Force with a Concrete Paving Train to meet construction requirements at AL Udeid AB, Qatar. This complex state of the art equipment consists of three independently operating pavement machines that pour the concrete, accurately place wet material to specified depths and widths, and provides a a final finish texture and curing rate to meet operational requirements. The train is capable of laying concrete at a non stop rate of over 500 cubic yards per hour at a width of 32 feet and varying depths up to 19 inches.